Ops & Knowledge Overview¶
Operations & Execution: Fulfillment, Logistics, and Quality Control.
This module ensures that once a deal is won, it is executed with precision, compliance, and efficiency. It bridges the gap between the Sales promise and the Supply Chain reality.
Operational Pillars¶
graph TD
A[Closed Order] --> B{Tender / Direct?}
B -->|Tender| C[GEM Portal Mgmt]
B -->|Direct| D[Order Processing]
D --> E[Logistics / Route Planning]
E --> F[Quality Check]
F --> G[Dispatch]
Functional Components¶
1. Operations & Logistics¶
Goal: Efficient physical movement of goods and sales teams.
-
Key Capability: Pincode-based Route Planning for Field Sales and Delivery.
-
Tech: Geospatial queries, Salesforce integration.
2. Tender Management (GEM)¶
Goal: Systematize the complex government bidding process.
-
Key Capability: OCR-based "Tender Screening" to automatically identify relevant bids from thousands of documents.
-
Tech: Tesseract/Azure OCR, Keyword matching engine.
3. Quality & Samples¶
Goal: Verify product specs before shipment.
-
Key Capability: "Smart COA" (Certificate of Analysis) management and Batch Shuffling.
-
Tech: Document vision, threshold validation logic.
DevOps & MLOps Use Cases¶
While the above sections cover business operations, the following use cases ensure the system's technical longevity and intelligence.
| ID | Title | Priority |
|---|---|---|
| OPS-004 | MLOps Training Pipeline | P2 |
| OPS-005 | DevOps CI/CD for Edge Devices | P2 |
| OPS-006 | Observability Stakeholder Alerts | P1 |
OPS-004: MLOps Training Pipeline¶
Goal: Automated model retraining to prevent classification drift. - Logic: Trigger a training run every 30 days OR when average confidence drops below 85% for a specific tenant. - Verification: Automatically split new ground-truth data (manually corrected by users) into training/validation sets.
OPS-005: DevOps CI/CD for Edge Devices¶
Goal: Hardened deployment pipeline for field visit tablets and local scanners. - Logic: Use blue-green deployment for edge services to ensure zero downtime for field reps syncing data. - Verification: Auto-rollback if data sync latency exceeds 10 seconds post-deploy.
OPS-006: Observability Stakeholder Alerts¶
Goal: Non-technical notification path for business stakeholders. - Logic: Monitor the "Email Ingestion" heartbeat. If no emails are ingested for > 30 mins during business hours, notify the IT Head and Sales Lead via Slack/SMS. - Verification: Simulates heartbeat failure to verify the alert escalation chain.
System Operations (DevOps)¶
Beyond business operations, this module also covers the technical health of the Pebble Orchestrator.
Monitoring Architecture¶
- Observability: Prometheus + Grafana for real-time metrics.
- Logging: Centralized ELK/Loki stack for tracing requests across microservices.
Key Metrics¶
| Metric | Purpose | Threshold |
|---|---|---|
api_latency |
User Experience | < 200ms |
worker_queue_depth |
System Load | < 500 jobs |
ocr_accuracy |
Data Quality | > 95% |
Knowledge & Retention¶
- Technical Knowledge Base: Central repository for product specs, MSDS, and compliance docs.
- Runbooks: Automated recovery procedures for high-load events.
Technical Continuity¶
To ensure 99.9% uptime for the GTM and Ops pipelines, Pebble implements the following continuity measures.
1. Backup & Recovery¶
| Component | Frequency | Retention | Tool |
|---|---|---|---|
| PostgreSQL | Daily | 30 Days | pg_dump |
| Email Metadata | Real-time | 90 Days | Redis AOF |
| Audit Logs | Weekly | 1 Year | S3/MinIO |
2. Scaling & Resilience¶
- Auto-Scaling: Workers scale horizontally based on
worker_queue_depth. - Fault Tolerance: If the CRM/ERP API is down, Pebble queues the sync action and retries with exponential backoff, ensuring no data loss.
- Disaster Recovery: 4-hour RTO (Recovery Time Objective) via automated infra-as-code (Terraform) redeployment.